Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13622825

- Product Categories
- Friendly Links
Information Name: | Jining reducer repair _ _ Jinan, Tianjin reducer repair Springfield |
Published: | 2015-07-23 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Gearbox installation ★ comprehensive information: 1, assembly and installation work must be carried out carefully by trained and qualified personnel quality. 2, during the planning and design stage to the gear box should allow sufficient space for future maintenance and repair of equipment for maintenance work. 3, before beginning the assembly and installation work must be ready suitable lifting equipment. 3, if the gearbox is equipped with a cooling fan, you should have enough space to be able to inhale air. ★ Note: ①, in outdoor installation should avoid the sun and rain, that is to take the necessary protective measures, Jining gear maintenance, such as adding protection provided Punta like. ②, be sure to avoid heat radiation concentrated. ③, the operator should ensure that no accumulation of falling objects or things on the gearbox, gear maintenance standard machine, otherwise it will affect the cooling performance of the gearbox. ④, prohibited welding work on the gearbox, flender gear maintenance, gear box may not be used for welding operations take place, because the welding can cause irreparable damage to the gear tooth surfaces and bearings. ⑤, should be used to install all the fixed points on the mounting surface of the gear box design. ⑥, damaged during assembly or during the disintegration of screw nuts and other fasteners must be replaced with a new model of the same strength and screw nuts and other fasteners. ⑦, in order to ensure good lubrication, must comply with the order set forth in the installation location. ★ inspection after installation: ① Check all bolts are tightened to the specified torque value. After tightening the fasteners ② Check whether the coupling alignment has changed. ③ control device list of specific orders and the drawings may be removed to check whether the device has already been installed back. ④ non-rotating parts must be seated properly and rotating parts can not be contacted. 2 During the Seventh Five countries, North commissioned after the world famous reducer factory inspection, siemens gear maintenance, according to the standards of the Flender Group companies Hardened reducer Chinese national standards and from the West suffered heavy machinery unit. 2 1988 Flender Group and Tangshan Metallurgical Machinery Factory to license the famous Flemish co-production REDUREX series Hardened reducer, manufacturing drawings of the product issued by the Ministry of Machine Factory and China's major slowdown, as China formed the basic series Hardened reducer. Jining Jinan Springfield reducer repair _ _ Tianjin reducer maintenance provided by the Electrical and Mechanical Equipment Co., Ltd. Jinan Springfield. Jining reducer repair _ _ Jinan, Tianjin reducer repair Springfield is Springfield Jinan Electrical Equipment Co. (www.jnspray.cn) this year introduced a new upgrade, the above picture is for reference only, please call or pictures on this page contact telephone number, to obtain the latest information, contact: Qinjing Li. |
Admin>>>
You are the 13222 visitor
Copyright © GuangDong ICP No. 10089450, Mechanical and Electrical Equipment Co., Ltd. Jinan Springfield All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 13222 visitor
Copyright © GuangDong ICP No. 10089450, Mechanical and Electrical Equipment Co., Ltd. Jinan Springfield All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility